Chris our site supervisor keeps me informed each Friday of what is happening and what will happen in the week ahead which is great. We are now considered to be at the lock up stage as we have completed internal linings..... air conditioning, insulation, electrical and plumbing are all in and the gyprock is up. I have included a few pics from various angles.
Something I did pick up was (when looking through windows) prior to gyprock being done is that our tv and associated power points that were meant to be high on the walls to allow us to wall mount our televisions had in fact been put down low. I have spoken with Eden Brae and they will rectify it for us. Aside from the main bedroom, we want to wall mount 4 televisions in the living room, rumpus, children's retreat and bedroom 2. They will just look better if the power and cords are hidden.
Ensuite bathroom
Rumpus room
Bedroom 2 looking into walk in robe
Looking from the main foyer down towards formal living and dining

Main bedroom from ensuite doorway

Kitchen and meals
Formal living
It gave us all a great perspective of the size of the rooms as some felt very different to how we had imagined. I absolutely love the big windows and I cannot wait to see it with kitchens and bathrooms put in. The next stage internally is the addition of skirting and carpentry, the wet areas and then it is on to kitchens and tiles. Our site supervisor estimates perhaps another 10 weeks of build time which would take us to the first week of July.
Bricklayers will hopefully start next week